Key Requirements: Detail Procedure Scope of Work : 1. DC checking ATP document from subcontractor 2. DC Checking for Survey document from subcontractor 3. DC checking BAPA document from subcontractor 4. DC preparation and uploading BAUT & BAST 5. D
Skills :
Key Responsibilities 1. Update connected date from RO database. 2. Update PMO Uniq, DU ID from RPC database. 3. Update PO Released based on Scarlett Syestem and BOQ. 4. Monitor site from NY Connected, Integrated, Kom-date, eRFI, eLV, and
Key Responsibilities Detail Procedure Scope of Work: 1. Need CSO Team Support for the Billing and Invoicing Preparation 2. Need Support RO Team , for preparing the Acceptance Documentation and check the Quality of Documents (Will be teach after Joi